Viewing Parcel Address (PIN)

More Information

The Open Source Data Files that are here are from Cook County.

This Page is a combination of all Files.

The Parcel Universe and most other Cook County files are categorized by PIN and Tax Year.

This page is PIN ONLY. You can expand this page (at the bottom) to see lists of all files related to this Pin.

The 2023 Data is from the Parcel Universe File with Tax_Year = 2023.

Viewing Parcel Address (PIN)


Last Modification Date: 2024-10-26 @ 12:46 AM
PIN: 16123210450000
Property Address: 2922 W WASHINGTON BLVD
City - Zip: CHICAGO - 60612
2023 Property Class: EX
2023 Township: 77 - West Chicago
2023 Neighborhood: 77102
2023 Tax District: 77106
Cook Viewer GIS: External GIS Website
Chicago Building Permits Data: 7 Permits
Permit # Issued Address Pin Work Expand
100251190 08/04/2008 2908 W WASHINGTON BLVD 16123210450000 CURTAIN WALL REPLACEMENT, ROOF, REPLACEMENT, PRECAT CLEANING AND ASSOCIATED CEILING AND WALL REPAIR,ROOF TOP MECHANICAL UNIT REPLACEMENT Expand
100295910 06/11/2009 2908 W WASHINGTON BLVD 16123210450000 ACM ABATEMENT, CEILING, DOORS, ENV BATHROOM, ENV DEMOLITION, FINISHES, INTERIOR/EXTERIOR SIGNAGE, INTERIOR RENOVATION, LBP ABATEMENT, PARKING LOTS, PHONE VOICE AND DATA, PLUMBING, TOILET ROOMS Expand
100354934 07/21/2010 2908 W WASHINGTON BLVD 16123210450000 RENOVATION OF EXISTING CLASSROOMS INTO SCIENCE CLASSROOMS; RENOVATION OF A WASHROOM INTO A CHANGING ROOM; ADA UPGRADES INCLUDING A STAGE LIFT AND ACCESSIBLE HEIGHT DRINKING FOUNTAIN; AND SIDEWALK WORK. Expand
100495626 06/19/2013 2922 W WASHINGTON BLVD 16123210450000 A/C UNIT REPLACEMENT WITH INTERIOR FINISH, DOOR AND ACCESSIBILITY IMPROVEMENTS. INSTALLATION OF MOBILE HOT FOOD SERVICE WITH TYPE II EXHAUST HOOD, HAND SINK AND FLOOR DRAIN. PATCHING OF ASPHALT GRAVEL BALLAST ROOF. RENOVATION OF TWO CLASSROOMS INTO COMPUTER LABS. Expand
100964621 05/18/2022 2908 W WASHINGTON BLVD 16123210450000 CPS ELEMENTARY SCHOOL WITH NO CHANGE IN USE (GROUP E). REPLACEMENT OF EXISTING EXTERIOR CONCRETE RAMP WITH NEW CONCRETE RAMP AT ACCESSIBLE BUILDING ENTRANCE, INTERIOR FINISHES AND DOOR HARDWARE REPLACEMENT. Expand
101002827 05/02/2023 2908 W WASHINGTON BLVD 16123210450000 CPS SCHOOL WITH NO CHANGE IN USE. THIS PROJECT IS FOR THE COMPLETE ROOF REPLACEMENT AND HVAC RENOVATION AND UPGRADE AT CATHER ELEMENTARY, A 2 STORY, EDUCATIONAL OCCUPANCY BUILDING OF TYPE 1B CONSTRUCTION. HVAC SCOPE INCLUDES COMPLETE REPLACEMENT OF THE HW PIPING THROUGHOUT, BOILER REPLACEMENT, AND THE ADDITION OF A ROOFTOP MOUNTED CHILLER. PROJECT SCOPE ALSO INCLUDES INCIDENTAL ARCHITECTURAL SCOPE RELATED TO THE MEP INCLUDING CEILING AND LIGHT REPLACEMENT, AND LIMITED FLOOR REPLACEMENT. Expand
100924357 06/28/2021 2908 W WASHINGTON BLVD 16123210450000 OCCUPANCY : EDUCATION E-1 , K-12 2 STORIES 70'-0" HIGHREMODELING OF PRE K CLASSROOM, BOY'S AND GIRL'S BATH ROOMNO CHANGE IN OCCUPANCY OR BUILDING CLASSIFICATION Expand