The Open Source Data Files that are here are from Cook County.
This Page is a combination of all Files.
The Parcel Universe and most other Cook County files are categorized by PIN and Tax Year.
This page is PIN ONLY. You can expand this page (at the bottom) to see lists of all files related to this Pin.
The 2023 Data is from the Parcel Universe File with Tax_Year = 2023.
Permit # | Issued | Address | Pin | Work | Expand |
---|---|---|---|---|---|
100251190 | 08/04/2008 | 2908 W WASHINGTON BLVD | 16123210450000 | CURTAIN WALL REPLACEMENT, ROOF, REPLACEMENT, PRECAT CLEANING AND ASSOCIATED CEILING AND WALL REPAIR,ROOF TOP MECHANICAL UNIT REPLACEMENT | Expand |
100295910 | 06/11/2009 | 2908 W WASHINGTON BLVD | 16123210450000 | ACM ABATEMENT, CEILING, DOORS, ENV BATHROOM, ENV DEMOLITION, FINISHES, INTERIOR/EXTERIOR SIGNAGE, INTERIOR RENOVATION, LBP ABATEMENT, PARKING LOTS, PHONE VOICE AND DATA, PLUMBING, TOILET ROOMS | Expand |
100354934 | 07/21/2010 | 2908 W WASHINGTON BLVD | 16123210450000 | RENOVATION OF EXISTING CLASSROOMS INTO SCIENCE CLASSROOMS; RENOVATION OF A WASHROOM INTO A CHANGING ROOM; ADA UPGRADES INCLUDING A STAGE LIFT AND ACCESSIBLE HEIGHT DRINKING FOUNTAIN; AND SIDEWALK WORK. | Expand |
100495626 | 06/19/2013 | 2922 W WASHINGTON BLVD | 16123210450000 | A/C UNIT REPLACEMENT WITH INTERIOR FINISH, DOOR AND ACCESSIBILITY IMPROVEMENTS. INSTALLATION OF MOBILE HOT FOOD SERVICE WITH TYPE II EXHAUST HOOD, HAND SINK AND FLOOR DRAIN. PATCHING OF ASPHALT GRAVEL BALLAST ROOF. RENOVATION OF TWO CLASSROOMS INTO COMPUTER LABS. | Expand |
100964621 | 05/18/2022 | 2908 W WASHINGTON BLVD | 16123210450000 | CPS ELEMENTARY SCHOOL WITH NO CHANGE IN USE (GROUP E). REPLACEMENT OF EXISTING EXTERIOR CONCRETE RAMP WITH NEW CONCRETE RAMP AT ACCESSIBLE BUILDING ENTRANCE, INTERIOR FINISHES AND DOOR HARDWARE REPLACEMENT. | Expand |
101002827 | 05/02/2023 | 2908 W WASHINGTON BLVD | 16123210450000 | CPS SCHOOL WITH NO CHANGE IN USE. THIS PROJECT IS FOR THE COMPLETE ROOF REPLACEMENT AND HVAC RENOVATION AND UPGRADE AT CATHER ELEMENTARY, A 2 STORY, EDUCATIONAL OCCUPANCY BUILDING OF TYPE 1B CONSTRUCTION. HVAC SCOPE INCLUDES COMPLETE REPLACEMENT OF THE HW PIPING THROUGHOUT, BOILER REPLACEMENT, AND THE ADDITION OF A ROOFTOP MOUNTED CHILLER. PROJECT SCOPE ALSO INCLUDES INCIDENTAL ARCHITECTURAL SCOPE RELATED TO THE MEP INCLUDING CEILING AND LIGHT REPLACEMENT, AND LIMITED FLOOR REPLACEMENT. | Expand |
100924357 | 06/28/2021 | 2908 W WASHINGTON BLVD | 16123210450000 | OCCUPANCY : EDUCATION E-1 , K-12 2 STORIES 70'-0" HIGHREMODELING OF PRE K CLASSROOM, BOY'S AND GIRL'S BATH ROOMNO CHANGE IN OCCUPANCY OR BUILDING CLASSIFICATION | Expand |