Viewing Parcel Address (PIN)

More Information

The Open Source Data Files that are here are from Cook County.

This Page is a combination of all Files.

The Parcel Universe and most other Cook County files are categorized by PIN and Tax Year.

This page is PIN ONLY. You can expand this page (at the bottom) to see lists of all files related to this Pin.

The 2023 Data is from the Parcel Universe File with Tax_Year = 2023.

Viewing Parcel Address (PIN)


Last Modification Date: 2024-10-23 @ 5:50 PM
PIN: 13364300160000
Property Address: 1619 N MAPLEWOOD AVE
City - Zip: CHICAGO - 60647
2023 Property Class: 211
2023 Township: 77 - West Chicago
2023 Neighborhood: 77030
2023 Tax District: 77162
Cook Viewer GIS: External GIS Website
Chicago Building Permits Data: 6 Permits
Permit # Issued Address Pin Work Expand
100295750 07/16/2009 1619 N MAPLEWOOD AVE 13364300160000 FRONT STAIR REPLACEMENT, SAME SIZE AND SAME LOCATION. PER PLANS. Expand
100705941 05/26/2017 1619 N MAPLEWOOD AVE 13364300160000 AT FRONT BUILDING: INTERIOR ALTERATIONS TO EXISTING 2 STORY FRAME BUILDING W/ BSMT. & ATTIC, DUPLEX LEVEL-2 UNIT UP TO ATTIC WITH NEW 18'-0"X17'-0" METAL DECK AND EXTERIOR REPAIRS, AS PER PLANS. THE SCOPE OF WORK INCLUDE: ARCHITECTURAL, PLUMBING, HVAC & ELECTRIC.CURRENT USE: RESIDENTIAL (3 D.U.) Expand
100705955 05/23/2017 1619 N MAPLEWOOD AVE 13364300160000 AT REAR BUILDING: INTERIOR ALTERATIONS TO AN EXISTING 1 1/2 STORY FRAME BUILDING, DE-CONVERT FROM EXISTING 4 D.U. TO 2 D.U. AND EXTERIOR WORK REPAIRS, AS PER PLANS. THE SCOPE OF WORK INCLUDE: ARCHITECTURAL, PLUMBING, HVAC & ELECTRIC.CURRENT USE: RESIDENTIAL (2 D.U.) Expand
100741501 12/26/2017 1619 N MAPLEWOOD AVE 13364300160000 PLUMBING CONTRACTOR CHANGED TO L&L PLUMBING INC. PERMIT#100705941 Expand
100741503 12/26/2017 1619 N MAPLEWOOD AVE 13364300160000 CHANGING PLUMBING CONTRACTOR TO L&L PLUMBING INC. PERMIT#100705955 Expand
100753271 03/29/2018 1619 N MAPLEWOOD AVE 13364300160000 REVISION TO PERMIT # 100705941 EXTERIOR ALTERATION AND FIX BLDG.VIOLATIONS, AS PER PLANS ON 3 STORY FRAME/BRICK FRONT BUILDING. THE SCOPE OF WORK INCLUDE: ARCHITECTURAL ONLY CURRENT USE: RESIDENTIAL (3 D.U.) Expand