Viewing Parcel Address (PIN)

More Information

The Open Source Data Files that are here are from Cook County.

This Page is a combination of all Files.

The Parcel Universe and most other Cook County files are categorized by PIN and Tax Year.

This page is PIN ONLY. You can expand this page (at the bottom) to see lists of all files related to this Pin.

The 2023 Data is from the Parcel Universe File with Tax_Year = 2023.

Viewing Parcel Address (PIN)


Last Modification Date: 2024-08-30 @ 4:07 PM
PIN: 13161120360000
Property Address: 5459 W LELAND AVE
City - Zip: CHICAGO - 60630
2023 Property Class: 278
2023 Township: 71 - Jefferson
2023 Neighborhood: 71090
2023 Tax District: 71033
Cook Viewer GIS: External GIS Website
Chicago Building Violations Data: 10 Violations
Violation Inspector Comments Address Category Status View
SUBMIT FOR APPROVAL PLANS 5459 W LELAND AVE COMPLAINT CLOSED View
MAINTAN BLDG IN SAFE CONDITION 5459 W LELAND AVE COMPLAINT CLOSED View
POST OWNER NAME OF VACNT BLDG 5459 W LELAND AVE COMPLAINT CLOSED View
BLANK-TEXT MUST CITE CODE SECT YOU ARE HEREBY NOTIFIED THAT PERMIT#100376093, ISSUED:12.14.10 AND PERMIT#100244387, ISSUED:9.2.08 HAVE BEEN REVOKED FOR LACK OF ACTIVITY FOR A PERIOD OF TIME OVER 12 MONTHS. SECTION 13.-12-110. 5459 W LELAND AVE COMPLAINT FAILED View
BLANK-TEXT MUST CITE CODE SECT BACKFILL OPEN FOUNDATION (25X70) WITH INORGANIC MATERIAL SECTION 13-8-090.CRUSHED STONE #67 ¿ SIZES FROM 3/4 DOWN TO FINE PARTICLES. FOR FILL. 5459 W LELAND AVE COMPLAINT FAILED View
FILE BLDG REGISTRATION 5459 W LELAND AVE COMPLAINT CLOSED View
REPAIR/WRECK DANGER RESID PREM 5459 W LELAND AVE COMPLAINT CLOSED View
WATCHMAN 5459 W LELAND AVE COMPLAINT CLOSED View
BLANK-TEXT MUST CITE CODE SECT REMOVE FROM OPEN FOUNDATION:ICE, WATER, WEEDS,TRASH,ETCSECTION 13-196-620, 13-196-630. 5459 W LELAND AVE COMPLAINT FAILED View
BLANK-TEXT MUST CITE CODE SECT PROVIDE FENCEBOOKMARK13-32-125 CONSTRUCTION SITE CLEANLINESS. (1) AS USED IN THIS SECTION: (A) ¿CONSTRUCTION AND DEMOLITION DEBRIS¿ OR ¿DEBRIS¿ HAS THE MEANING ASCRIBED TO THE FORMER TERM IN SECTION 11-4-120 OF THIS CODE. (B) ¿CONSTRUCTION SITE¿ MEANS ANY OR ALL PORTION OF THE REAL PROPERTY THAT IS IDENTIFIED AS THE LOCATION OF ANY EXCAVATION OR OF THE ERECTION, ENLARGEMENT, ALTERATION, REPAIR, REMOVAL OR DEMOLITION OF ANY BUILDING, STRUCTURE OR STRUCTURAL PART THEREOF WITHIN THE CITY AND THAT REQUIRES A PERMIT UNDER CHAPTER 13-32 OF THIS CODE. HOWEVER, FOR PURPOSES OF THIS SECTION, ¿CONSTRUCTION SITE¿ DOES NOT INCLUDE A PROJECT LOCATION WHERE ALL CONSTRUCTION AND/OR DEMOLITION ACTIVITY, INCLUDING THE STAGING OF CONSTRUCTION MATERIALS AND STORING OF DEBRIS, IS CONDUCTED WITHIN A COMPLETELY ENCLOSED STRUCTURE; NOR DOES IT INCLUDE ANY PROJECT LOCATION ON ANY PROPERTY THAT IS, OR HEREAFTER BECOMES, PART OF CHICAGO-O'HARE INTERNATIONAL AIRPORT OR CHICAGO MIDWAY AIRPORT. DURING THE TERM OF ANY CONCESSION AND LEASE AGREEMENT BETWEEN THE CITY OF CHICAGO AND A PRIVATE OPERATOR WITH RESPECT TO CHICAGO MIDWAY AIRPORT, THE WORDS ¿OR CHICAGO MIDWAY AIRPORT¿ SHALL BE DELETED FROM THIS PARAGRAPH (1)(B). (C) ¿GARBAGE¿ HAS THE MEANING ASCRIBED TO THE TERM IN SECTION 11-4-120 OF THIS CODE. (D) ¿GENERAL CONTRACTOR¿ HAS THE MEANING ASCRIBED TO THE TERM IN SECTION 4-36-010 OF THIS CODE. ¿GENERAL CONTRACTOR¿ SHALL ALSO INCLUDE A SUBCONTRACTOR WITH RESPECT TO A VIOLATION OF THIS SECTION THAT IS DIRECTLY ATTRIBUTABLE TO THE SUBCONTRACTOR. (E) ¿LITTER¿ HAS THE MEANING ASCRIBED TO THE TERM IN SECTION 7-28-200 OF THIS CODE. (2) ALL CONSTRUCTION SITES SHALL BE GOVERNED BY THE FOLLOWING STANDARDS: (A) THE GENERAL CONTRACTOR SHALL EMPLOY ADEQUATE WETTING OR OTHER ABATEMENT MEASURES TO PREVENT THE OFF-SITE DISPERSION OF DUST AND DEBRIS FROM A CONSTRUCTION SITE. (B) ALL CONSTRUCTION SITES SHALL BE ENCLOSED AND SECURED BY A CONTINUOUS CHAIN LINK FENCE AT LEAST SIX FEET IN HEIGHT WHICH SHALL BE ANCHORED SUFFICIENT TO RESIST WIND LOADS OF 30 POUNDS PER SQUARE FOOT WITHOUT DEFLECTION OF MORE THAN THREE INCHES BETWEEN TOP AND BOTTOM OF FENCE. THE GENERAL CONTRACTOR MAY ALLOW ONE GATE TO REMAIN OPEN WHILE CONSTRUCTION WORKERS ARE PERFORMING CONSTRUCTION ACTIVITIES ON THE CONSTRUCTION SITE. THE GATE SHALL BE NO LARGER THAN IS REASONABLY NECESSARY TO PROVIDE FOR TRUCK ACCESS. (C) FABRIC MESH SHALL BE AFFIXED TO THE CONSTRUCTION SITE FENCE FACE. (I) THE FABRIC MESH SHALL ALLOW THE PASSAGE OF AIR BUT SHALL CONTAIN DUST AND DIRT. (II) SUCH MESH FABRIC SHALL BE THE FULL HEIGHT OF THE FENCE AND COVER THE ENTIRE LENGTH OF THE FENCE INCLUDING ANY GATED OPENINGS. (III) THE FABRIC MESH AND FENCE SHALL NOT CONTAIN ANY ADVERTISEMENTS OR GRAFFITI. (D) THE CONSTRUCTION SITE FENCE SHALL BE PLACED AT THE PERIMETER OF THE PROPERTY OR, FOR WORK IN AN AREA SUBSTANTIALLY SMALLER THAN THE ENTIRE PROPERTY, AROUND THE SITE OF CONSTRUCTION LARGE ENOUGH TO ENSURE SUFFICIENT ROOM FOR MOVEMENT OF TOOLS AND WORKERS, STORAGE OF WASTE RECEPTACLES AND OTHER ITEMS, AND THE SAFETY OF THE PUBLIC. (E) THE GENERAL CONTRACTOR SHALL IMMEDIATELY REPAIR ANY DAMAGE TO THE CONSTRUCTION SITE FENCE OR FENCE FABRIC AND MAINTAIN THE INTEGRITY AND CONTINUITY OF THE FENCE FOR THE DURATION OF THE PROJECT. 5459 W LELAND AVE COMPLAINT FAILED View